Server Enclosure/

New York City Facility

HVAC/

New York City Facility

Amenities/

New York City Facility

Security/

New York City Facility

Cabling/

New York City Facility

Fire Suppression/

New York City Facility

Electrical Infrastructure/

New York City Facility


100 William Street leverages its location to the maximum benefit of NYI customers. A 30,000+ square foot, SSAE16 compliant facility that is both NYI's headquarters and its main data center, 100 William combines the efficiencies of a contemporary data center with the strategic connectivity advantages that being in the center of the world's financial capital offers.

NYI has succeeded through ownership: ownership of customer need as if it were NYI's own, as well as ownership of the data center itself -- a level of accountability that was unprecedented in the industry in 1996 when NYI began, and is still unprecedented today.

FACILITY DATA SHEET

Building Specifications

  • Located in the heart of Lower Manhattan with direct connectivity to all major exchanges and peering networks as well as low-latency access to 999 Frontier, NYI's DP/BCP facility less than 40 miles away in Bridgewater, NJ
  • SSAE16, HIPAA, PCI Compliant
  • 18" raised floor with fire and flood sensors throughout
  • Roof access available

Security

  • Multiple layers of hardened physical security
  • 24x7x365 on-site security
  • CCTV surveillance with digital storage
  • Multiple layers of electronically controlled card access
  • Biometric access

Power Distribution

  • Over 2MW of power available
  • N + 1 UPS configuration with 15 minutes of battery runtime at full capacity
  • Generator Backup capable of at least 72 Hours Runtime
  • Power density of over 150 Watts per square foot
  • Automatic Transfer Switch Gear (ATS) which switches to generator power within 90 seconds of commercial power loss
  • 120V, 208V, 208V 3-Phase and 48V DC power options
  • Hospital-grade fueling contracts with multiple vendors to ensure priority refueling

Environmental Control

  • N + 1 redundant cooling
  • Hot Row/Cold Row Cabinet Configuration to ensure optimal efficiency
  • Raised floor delivery

Fire Detection/Suppression

  • Zoned, triple pre-action VESDA fire suppression system